Altura Mining TSF Pipeline & HDD

16 April 2019

Cape was engaged by Altura Mining to undertake the installation of a 10km TSF pipeline and supporting infrastructure, including pump manifolds and reverse osmosis plant pipeworks. In addition, Cape also performed horizontal directional drilling (HDD) works to install 155m of DN250 pipe under the BHP rail line. The project, located at Pilgangoora in Western Australia, is […]

Read More

FMG Culverts (Pilbara)

27 March 2019

Through our Aboriginal KCU joint venture, Cape installed culverts for FMG at its Cloudbreak and Christmas Creek mine sites in the Pilbara. The scope of works included: • Survey, level and alignment of culverts at each location • Road diversions to accommodate two-way traffic • Load, transport and unload all culvert pipes and other construction materials […]

Read More

Arsenic Storage Dam

12 February 2019

A volume of 80,000m3 of material was loaded, hauled, placed and compacted to construct four perimeter walls 10m high. Material was excavated from a shallow borrow pit within the facility. Wet weather conditions during construction meant that constant control was required to ensure moisture and compaction levels were correct. This was critical to achieving target specifications […]

Read More

Rio Tinto Primary Crushing Facility

12 February 2019

The scope of work for this contract included primary crusher design, fabrication, installation, operation and ROM Management. Cape was required to design, fabricate, transport, and assemble a turnkey primary crushing facility for the contract. The facility was installed in two stages feeding directly into the client processing facility. Stage I consisted of a trailer mounted […]

Read More

Mt Gibson Iron

12 February 2019

In excess of 7.5 million tonnes of material was produced during this crushing and screening contract. Output level and specifications were determined by the client with a large amount of DSO produced. The contract required 24/7 operations and production of DSO -6.3mm fines peaked at 160,000 tonnes per month. Due to the remote site location, […]

Read More

BHP Nickel West ROM Management & Primary Crusher

12 February 2019

For seven years, Cape provided ROM Pad Management and Primary Crushing services at BHP Nickel West’s Kambalda operations. The contract required Cape to manage and operate a complex ROM, receiving ore from a number of third party sources. After primary crushing, the ore was fed to either a sample crushing circuit or a coarse ore […]

Read More

Busselton Pressure Main & Gravity Sewer

12 February 2019

Package 2A: This package comprised of approximately 8172m of PN16 DN300 O-PVC pressure main and 405m of DN400 SDR11 HDPE pressure main. It included the construction of approximately 555m of PN12 DN250 U-PVC pressure main from the existing Blum Boulevard pressure main connection point on Hawker Approach to a DN1200 discharge access chamber and stub […]

Read More

Busselton West Pressure Main

12 February 2019

Construction of Busselton West Street DN450 Pressure Main Replacement including: 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street Installation of 500m temporary DN200 HDPE PN16 bypass pressure main 2 nightshift shutdowns […]

Read More

Carnarvon Bore Main Replacement

12 February 2019

Stage 1 Construction, installation, testing and commissioning of 10.5km of DN630 PN12.5 HDPE to replace the existing DN600 Asbestos Cement (AC) bore water collector main. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, stock watering points, bore connection fittings and ancillaries. Also, construction of a pipeline access […]

Read More

Narembeen TWS Upgrade

12 February 2019

Manufacture, supply, construction, installation, testing and pre-commissioning of civil, structural, mechanical, process, electrical, instrumentation & control (I & C) infrastructure assets for the MS Extension Narembeen TWS Upgrade. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, and associated ancillaries. Supply and Install West Narembeen Tank to Narembeen […]

Read More

Yule Collector Main

12 February 2019

Construction of DN630 Yule Bore Collector Main 6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing 6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new culverts on the new track alignment;

Read More

Peelhurst Pressure Mains & Pump Station

12 February 2019

Supply, construction, installation, testing and commissioning of 5,780m of new DN375GRP and DN400 PE100 PN20 distribution main, fittings, pits and access chambers. Supply, construction, and installation of all precast and in cast situ concrete structures, along Warnbro Sound Ave. The project also involved the upgrading of 3 Pump Stations: Bluestone Parkway Pump Station, Naples Place […]

Read More