In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure.
The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore pump packages and a transfer pumping station package at the mine site to enable a fully functioning water pipeline system, including: