Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Pilgangoora Lithium-Tantalum Project

Pilgangoora Lithium-Tantalum Project

Water Project: Pilbara Minerals (Marble Bar WA)

In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure.

The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore pump packages and a transfer pumping station package at the mine site to enable a fully functioning water pipeline system, including:

  • 16.5km of DN250 pipeline and pumping system from the Southern Borefield to the Process Plant raw water tank TK020.
  • 1.5km of DN280 pipeline and pumping system from Turkeys Nest 1 to the Process Plant raw water tank TK020.
  • 2.5km of DN250 pipeline and pumping system from Bore 50 to Process Plant raw water tank TK020.
  • 2.3km of DN160 pipeline and pumping system from new Bore 6 & 7 to Turkeys nest
  • 1.5km of DN200 pipeline and pumping system from new Bore 1 to Bore 2
cape project

Project Details

Client. Pilbara Minerals
Location. Pilgangoora, Marble Bar WA, Australia
Project Duration. 2018 onwards
Fields marked with an * are required

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2021 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine