Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including:
Cape is constructing these drainage systems utilising out Trenching Fleet to achieve greater productivity and safety outcomes for the project.