Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Newmont Boddington Drainage Trenching

Newmont Boddington Drainage Trenching

Water Project: Newmont (Bannister WA)

Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including:

  • Embankment toe drain constructed along the toe of the existing embankment
  • Buttress toe drain constructed along the downstream toe of the constructed buttress
  • Perimeter drain constructed outside of the buttress footprint/work area. Cross drains will interconnect from the buttress toe drain to the perimeter drain.

Cape is constructing these drainage systems utilising out Trenching Fleet to achieve greater productivity and safety outcomes for the project.

newmont boddington project

Project Details

Client. Newmont
Location. Boddington Gold Mine, Gold Mine Road, Bannister WA, Australia
No Fields Found.

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2022 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine