Newmont Boddington Drainage Trenching

27 March 2019

Water Project: Newmont (Bannister WA) Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including: Embankment toe drain constructed along the toe of the existing embankment Buttress toe drain constructed along the downstream toe of the constructed buttress Perimeter drain constructed outside of the […]

Read More

Floreat Underground Power Program

27 March 2019

Power Project: Western Power (Floreat WA) In 2018, Cape was awarded two packages of work, as part of the Town of Cambridge’s $40 million underground power program – Floreat East and Floreat West, encompassing 1781 homes, 57km of horizontal directional drilling, removal of 965 power poles and the installation of 597 street lights. Cape has been supporting Western […]

Read More

FMG Culverts (Pilbara)

27 March 2019

Water Project: Fortescue Metals Group (Nullagine WA) Through our Aboriginal KCU joint venture, Cape installed culverts for FMG at its Cloudbreak and Christmas Creek mine sites in the Pilbara. The scope of works included: • Survey, level and alignment of culverts at each location • Road diversions to accommodate two-way traffic • Load, transport and unload […]

Read More

Arsenic Storage Dam

12 February 2019

TSF & Ponds Project: BHP Billiton (Feysville WA) A volume of 80,000m3 of material was loaded, hauled, placed and compacted to construct four perimeter walls 10m high. Material was excavated from a shallow borrow pit within the facility. Wet weather conditions during construction meant that constant control was required to ensure moisture and compaction levels were […]

Read More

Rio Tinto Primary Crushing Facility

12 February 2019

Crushing & Screening Project: Rio Tinto (Mount Sheila WA) The scope of work for this contract included primary crusher design, fabrication, installation, operation and ROM Management. Cape was required to design, fabricate, transport, and assemble a turnkey primary crushing facility for the contract. The facility was installed in two stages feeding directly into the client […]

Read More

Mt Gibson Iron

12 February 2019

Crushing & Screening Project: Mt Gibson Iron (Koolan Island WA) In excess of 7.5 million tonnes of material was produced during this crushing and screening contract. Output level and specifications were determined by the client with a large amount of DSO produced. The contract required 24/7 operations and production of DSO -6.3mm fines peaked at […]

Read More

BHP Nickel West ROM Management & Primary Crusher

12 February 2019

Crushing & Screening Project: BHP Billiton (Kambalda East WA) For seven years, Cape provided ROM Pad Management and Primary Crushing services at BHP Nickel West’s Kambalda operations. The contract required Cape to manage and operate a complex ROM, receiving ore from a number of third party sources. After primary crushing, the ore was fed to […]

Read More

Busselton Pressure Main & Gravity Sewer

12 February 2019

Water Project: Water Corporation (Yalyalup WA) Package 2A: This package comprised of approximately 8172m of PN16 DN300 O-PVC pressure main and 405m of DN400 SDR11 HDPE pressure main. It included the construction of approximately 555m of PN12 DN250 U-PVC pressure main from the existing Blum Boulevard pressure main connection point on Hawker Approach to a […]

Read More

Busselton West Pressure Main

12 February 2019

Water Project: Water Corporation (West Busselton WA) Construction of Busselton West Street DN450 Pressure Main Replacement including: 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street Installation of 500m temporary DN200 HDPE […]

Read More

Carnarvon Bore Main Replacement

12 February 2019

Water Project: Water Corporation (Carnarvon WA) Stage 1 Construction, installation, testing and commissioning of 10.5km of DN630 PN12.5 HDPE to replace the existing DN600 Asbestos Cement (AC) bore water collector main. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, stock watering points, bore connection fittings and ancillaries. […]

Read More

Narembeen TWS Upgrade

12 February 2019

Water Project: Water Corporation (Narembeen WA) Manufacture, supply, construction, installation, testing and pre-commissioning of civil, structural, mechanical, process, electrical, instrumentation & control (I & C) infrastructure assets for the MS Extension Narembeen TWS Upgrade. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, and associated ancillaries. Supply and […]

Read More

Yule Collector Main

12 February 2019

Water Project: Water Corporation (Port Hedland WA) Construction of DN630 Yule Bore Collector Main 6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing 6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new […]

Read More