Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / FMG Iron Bridge Construction Water Supply

FMG Iron Bridge Construction Water Supply

Water Project: FMG (Port Hedland WA)

The FMG Iron Bridge Magnetite Project is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product.

The Iron Bridge site comprises the North Star, Eastern Limb, Glacier Valley and West Star magnetite iron ore deposits located located 145km south of Port Hedland.

Cape has been engaged by FMG to construct the infrastructure required for water supply during the construction phase and includes:

  • Construction of approximately 22 km of pipe and all associated fittings, valves and ancillaries
  • Refurbishment of 2 x turkey’s nests
  • Final trim and lining of 1 x new turkey’s nest
  • Installation and commissioning of 4 x diesel driven pump skids including all associated ancillaries
  • Relocation, installation and commissioning of 2 x skid mounted electric driven booster pump skids including all associated ancillaries.

 

injection bore

Project Details

Location. Port Hedland, WA, Australia
Start Date. 26/08/2019
Project Duration. 3 months
No Fields Found.

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2022 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine