The Bluff Wind Farm

12 February 2019

Power Project: ETSA (Jamestown SA) The installation at the Bluff Wind Farm situated in Jamestown, South Australia comprised 15,500mtrs of HV cable, 28,000mtrs fibre optic cable and 25,500mtrs earth wire connecting 25 turbines putting our EcoPlough with its unique ploughing method to work. This project was environmentally friendly with minimal disturbance to the vegetation and […]

Read More

Jimblebar – RGP6

12 February 2019

Power Project: BHP Billiton & Theiss (Newman WA) The project was located approximately 39km east of Newman and involved detailed earthworks, trenching, bedding, and backfilling of underground services as well as the installation of electrical and communications infrastructure. The scope included: 206,000 bcm of detailed earthworks 41km of Raw Water and Portable Water Pipelines 4km Oily […]

Read More

Port Hedland Inner Harbour Project

12 February 2019

Power Project: BHP Billiton & Calibre (Port Hedland WA) Located in the Pilbara region, Cape was engaged to supply, install and commission high voltage and low voltage power infrastructure to BHP Billiton assets in and around Port Hedland and Finucane Island. The scope included: 100km of LV cable 40km of HV cable 7 x switchgears […]

Read More

Claremont WTE-CTE 81 Relocation

12 February 2019

Power Project: Western Power (Claremont WA) The scope of works for this project included: A section of the existing WT-CTE 81 overhead 132kV transmission line was moved underground and replaced between existing pole 49 (Eastern side of the alignment) and pole 57 (Western side of the alignment) Installation of one new cable transition structure, transitioning […]

Read More

CBD Works – 2 Stages

12 February 2019

Power Project: Western Power (Perth WA) Stage 1 included the installation of eight no. 150 diameter A15:B15 carrying 11kv feeder cable through the Perth city centre to supply the new BHP building. The cables were laid within eight conduits beneath the road pavement in a trench approximately 1.3m width and 1.2m deep. This project required close liaison […]

Read More

Calleya 400HV Cable Installation

12 February 2019

Power Project: Stocklands (Harrisdale WA) This project involved the construction and installation of: • Approximately 6.2km of 1 x 400mm2 HV feeder cable & conduit from Southern River Zone Substation to Pole termination of Warton road • 400mm2 HV cable joint bay • Cable joints to the feeder cable • HV straight joints • Sheath testing of […]

Read More

132kV Feeder Joel Terrace

12 February 2019

Power Project: Western Power (Perth WA) Cape undertook the task of installing three new feeder cables in existing conduits and extend the existing spare conduits by approximately 20 metres under the railway reserve between East Parade and Summer Street, East Perth.

Read More

Perth City Square Upgrade

12 February 2019

Power Project: Western Power (Perth WA) This project consisted of excavation, installation and backfilling works of two 132kV underground cable circuits in flat formation from the cable termination structures located inside the Milligan Street Substation to the existing underground cable joints in the Northern side of junction between Milligan Street and Murray Street. Installed alongside […]

Read More

132kV Interconnection Clarkson – PTA Nowergup Substations

12 February 2019

Power Project: Western Power (Claremont WA) The scope of works included the installation of one 132 kV cable circuit and two communication ducts over a route distance of approximately 850 metres. Specifically: • Cable Installation – Directional Drilling and Open Trenching: 2 x 132 kV single core 400 mm2 copper conductor, XLPE insulated, copper tape and […]

Read More

North Brown Hill Wind Farm

12 February 2019

Power Project: (North Brown Hill SA) Cape successfully completed installation works at a wind farm located in North Brown Hill, South Australia using the company’s unique ploughing installation method. Our team installed 65km of high voltage power and fibre optic cabling, ultimately connecting 55 wind turbines. Minimal disturbance was caused to the surrounding livestock and natural vegetation, […]

Read More

Mumbida Wind Farm

12 February 2019

Power Project: Leighton Contractors (Geraldton WA) Located approximately 40km south-east of Geraldton, the project included trenching, cable installation, backfilling and HV termination works for the connection of 22 wind turbines.

Read More

Whiteman Edge Estate Gas Pipeline

12 February 2019

Gas Project: ATCO Gas (Henley Brook WA) The scope of work for this project comprised of two parts: the installation and commissioning of a DN160mm SDR11 PE 100 SW AS4130 pipeline from Lord Street to Starflower Place between Gnangara Road and Park Street and the installation and commissioning of a DN110mm SDR17 PE80B/100 S2 AS4130 pipeline from […]

Read More