Cape successfully completed installation works at a wind farm located in North Brown Hill, South Australia using the company’s unique ploughing installation method. Our team installed 65km of high voltage power and fibre optic cabling, ultimately connecting 55 wind turbines. Minimal disturbance was caused to the surrounding livestock and natural vegetation, delivering an ideal outcome.