A section of the existing WT-CTE 81 overhead 132kV transmission line was moved underground and replaced between existing pole 49 (Eastern side of the alignment) and pole 57 (Western side of the alignment)
Installation of one new cable transition structure, transitioning from overhead to underground (pole 49), removal and replacement of five existing poles number 48 to 44 with provision to support earth wire
Installation of one new cable transition structure (pole 50), removal and replacement of three existing poles numbered 58 to 60 with provision to support earth wire (poles 51 to 53)