Newmont D6 Dam and Mine Infrastructure Project

29 August 2019

Cape has been engaged by Newmont Gold Corporation to deliver the D6 Dam and Mine Infrastructure Project at the Boddington mine The overall project scope is to deliver a seven gigalitre water storage facility and includes: Supply and construction of five pumping stations complete with more than 15 pumps Electrical works Supply and install a […]

Read More

FMG Iron Bridge Construction Water Supply

29 August 2019

The FMG Iron Bridge Magnetite Project is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron Bridge site comprises the North Star, […]

Read More

Rio Tinto Koodaideri Rail Optical Fibre Project

29 August 2019

The Koodaideri ore development is a new iron ore mine that will be constructed for Rio Tinto (RTIO). The mine is located approximately 110 km west-north-west of Newman in the Pilbara region of Western Australia. To allow for the transportation of the Koodaideri iron ore product a new 170km rail spur is required, this will […]

Read More

South Flank Piping & Electrical Package

16 April 2019

BHP’s South Flank deposit is located approximately 130 km by road north-west of the town of Newman, and approximately 8 km to the south of the Companys existing Mining Area C operation. Cape have been engaged by NRW to deliver piping and electrical packages as part of NRW’s bulk earthworks civil and concrete package.  This […]

Read More

Great Northern Highway Relocation

16 April 2019

Cape has been engaged to relocate distribution assets along Great Northern Highway to facilitate the completion of the Main Roads WA Great Northern Highway – Muchea to Wubin (Stage 2) Project. The scope includes approximately: 2.5km of underground cable, 1.6km of conduit, 18km of conductor and 116 new wooden poles to be installed.

Read More

PTA Airport Link Traction Power Supply Project

27 March 2019

In 2018, Cape secured a contract to energise the Public Transport Authority’s new Maida Vale Substation, as part of the Forrestfield Airport Link Project. Our team is installing approximately 3.5km of three phase underground cable, communications ducts and associated pits to create a new transmission line from the existing 132kV Substation at Forrestfield.  

Read More

Wanneroo Road and Joondalup Drive Relocation

27 March 2019

Cape has been engaged to install two 132kV circuits of underground transmission line as well as supply and construct foundations for transition poles as part of the Main Roads WA overpass bridge construction at the intersection of Joondalup Drive and Wanneroo Road.

Read More

Pilgangoora Lithium-Tantalum Project

27 March 2019

In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure. The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore pump packages and a transfer pumping station […]

Read More

Newmont Boddington Drainage Trenching

27 March 2019

Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including: Embankment toe drain constructed along the toe of the existing embankment Buttress toe drain constructed along the downstream toe of the constructed buttress Perimeter drain constructed outside of the buttress footprint/work area. Cross drains […]

Read More

Floreat Underground Power Program

27 March 2019

In 2018, Cape was awarded two packages of work, as part of the Town of Cambridge’s $40 million underground power program – Floreat East and Floreat West, encompassing 1781 homes, 57km of horizontal directional drilling, removal of 965 power poles and the installation of 597 street lights. Cape has been supporting Western Power’s Underground Power Program since its […]

Read More

FMG Dewatering Operations (Pilbara)

27 March 2019

Through our Aboriginal KCU joint venture, Cape continues to run one of the largest dewatering programs in the southern hemisphere for FMG, at their Cloudbreak, Christmas Creek and Solomon mine sites in the Pilbara. We have installed approximately 100km of dewatering pipelines annually over the past five years. This includes deposition lines, decant lines, and borefieldlines in both HDPE […]

Read More

AngloGold Ashanti

12 February 2019

Cape has been engaged to provide crushing and screening services at AngloGold’s Tropicana operations, as the result of two performance-related contract extensions. Utilising mobile crushing and screening circuits Cape is required to produce 180,000 tonnes of Blast Hole Stemming at -25mm+10mm and 934,000 tonnes of Road Base at -40mm.

Read More