Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Tuart Lakes Lifestyle Village

Tuart Lakes Lifestyle Village

Gas Project: WestNet Energy (Mandurah WA)

Tuart Lakes Lifestyle Village development in Baldivis required a new natural gas supply for domestic use with all required headworks. The gas supply would come from the DN160mm SDR17.6 PE80B gas main at the corner of McDonald Rd and Fifty Rd, Baldivis.

A new 2400m long x DN160mm SDR11 PE100 high-pressure gas main was built in the Mandurah Rd and Fifty Rd reserve between the end of the existing 160PEHP main at McDonald Rd and the Tuart Lakes Lifestyle Village development. The new gas main was installed in a common trench along with a new water main servicing the subdivision.

tuart lakes projects

Project Details

Client. WestNet Energy (ATCO Gas)
Location. Mandurah WA, Australia
Project Duration. 4 Months
Fields marked with an * are required

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2021 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine