Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Horizontal Directional Drilling (HDD)
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Horizontal Directional Drilling (HDD)
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Tailings Storage Facility Construction TSF4

Tailings Storage Facility Construction TSF4

TSF & Ponds Project: Goldfields

163,000 BCM of materials were loaded, hauled, placed and compacted utilising Doosan 48t Excavators, JCB 36t Excavator, Caterpillar D6 Swampy track Dozer, 18t Pad Foot Roller, Cat 740 Ejector Trucks, Volvo Articulated Water Truck and Komatsu GD655 Grader to raise the outer TSF walls and Decant Structure by 2.5m.

Cape ran a 9-person dedicated crew to the project who delivered the works safely. The project was completed with a TRIFR rate of Zero. No medically treated injuries. No restricted duties cases and No Lost Time Injuries.

Full Environmental compliance with no recordable incidents and it was completed in accordance with ISO9001 with full suite of systems documentation.
• MDR
• Test records
• NCR
• Document changes
• ITP

tsf project

Project Details

Client. Goldfields
Project Duration. 5 months

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Horizontal Directional Drilling (HDD)
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2026 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine