Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Rio Tinto Primary Crushing Facility

Rio Tinto Primary Crushing Facility

Crushing & Screening Project: Rio Tinto (Mount Sheila WA)

The scope of work for this contract included primary crusher design, fabrication, installation, operation and ROM Management.

Cape was required to design, fabricate, transport, and assemble a turnkey primary crushing facility for the contract. The facility was installed in two stages feeding directly into the client processing facility.

Stage I consisted of a trailer mounted electric jaw crusher with a 120m overland conveyor capable of 1,000tph.

Stage II consisted of a second trailer mounted jaw and 80m overland conveyor to a second feed point, and included Stage I tying across to the new overland conveyor. The new total combined output increased to 2,000tph.

Once operational, the contract required Cape to manage and operate the ROM and crushing circuit producing a feed for the RTIO processing facility of -200mm. Feed of the crusher was done using a CAT992 front end loader.

rio tinto crushing project

Project Details

Client. Rio Tinto Iron Ore
Location. Nammuldi Rio Tinto, Mount Sheila WA, Australia
Project Duration. 18 Months
No Fields Found.

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2022 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine