Marandoo Horizontal Dewatering Well

Rio Tinto Iron Ore (RTIO)

Location

Karijini National Park, WA

Service

HDD Drilling

Sector

Mining

Expertise

Large-diameter horizontal dewatering wells for complex mining environments.

Cape Dunstans partnered with Rio Tinto to design and deliver an innovative horizontal dewatering well at its Marandoo open-pit mine in the Pilbara.

Delivered through an Early Contractor Involvement model, the solution eliminated the need for conventional in-pit vertical dewatering infrastructure. This reduced operational activity within the pit while improving safety and dewatering efficiency.

Project delivery included:

A horizontal dewatering well drilled to a measured depth of 1,306 metres and a vertical depth of 173 metres.

Installation of 810 metres of 16-inch casing and a site-specific slotted production section designed for the mine’s groundwater conditions.

Delivery of Rio Tinto Iron Ore’s longest 16-inch cased drill shot and its longest water well at the time of construction.

Previous Next

Let’s talk

We construct trenchless infrastructure through strong partnerships practical engineering and controlled construction.

Get in touch