Marandoo Horizontal Dewatering Well

Rio Tinto Iron Ore (RTIO)

Location

Karijini National Park, WA

Service

HDD Drilling

Sector

Mining

Expertise

Large-diameter horizontal dewatering wells for complex mining environments.

Cape Dunstans partnered with Rio Tinto to design and deliver an innovative horizontal dewatering well at its Marandoo open-pit mine in the Pilbara.

Delivered through an Early Contractor Involvement model, the solution eliminated the need for conventional in-pit vertical dewatering infrastructure. This reduced operational activity within the pit while improving safety and dewatering efficiency.

Project delivery included:

A horizontal dewatering well drilled to a measured depth of 1,306 metres and a vertical depth of 173 metres.

Installation of 810 metres of 16-inch casing and a site-specific slotted production section designed for the mine’s groundwater conditions.

Delivery of Rio Tinto Iron Ore’s longest 16-inch cased drill shot and its longest water well at the time of construction.

← Previous → Next

Let's talk

We construct trenchless infrastructure through strong partnerships practical engineering and controlled construction.

→ Get in touch