Cape Dunstans partnered with John Holland to deliver a $6 million horizontal directional drilling (HDD) crossing beneath the Nerang River as part of the City of Gold Coast's long-term recycled water infrastructure program.
The project involved installing 880 metres of DN1200 HDPE pipeline between Winchester Street and Waterways Drive in Southport. The technically challenging crossing required an innovative dual-rig HDD intersect methodology to navigate varying geological conditions while minimising impacts on the river and surrounding environment.
Project delivery included:
Installation of 880 metres of DN1200 HDPE pipeline beneath the Nerang River using two HDD rigs operating from opposite sides of the crossing.
Design and construction of a high-capacity drilling fluid recycling system capable of processing 4,500 litres per minute, alongside specially fabricated reamers, pulling heads and borehole cleaning equipment.
Successful navigation of challenging ground conditions, ranging from coastal sands and clay to 40 MPa meta-siltstone, with careful drilling fluid management to protect environmentally sensitive waterways and surrounding ecosystems.