In excess of 7.5 million tonnes of material was produced during this crushing and screening contract. Output level and specifications were determined by the client with a large amount of DSO produced. The contract required 24/7 operations and production of DSO -6.3mm fines peaked at 160,000 tonnes per month.
Due to the remote site location, logistics planning and maintenance was absolutely critical with Cape having a full workshop and team in operation throughout the contract to ensure works were completed with minimal equipment downtime.