Supply and Install approximately 563m of DN250 PE100 pressure main on Cammilleri Street and Peel Terrace by Horizontal Directional Drilling; supply and install 100m of 375 PVC Gravity Sewer by open trench incl. but not limited to the supply and installation of plastic lined access chamber and preparation for connections to existing discharge Main and Gravity Sewer.