Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Alkimos Distribution Main

Alkimos Distribution Main

Water Project: Water Corporation (Alkimos WA)

Stage 1 – 1735m DN800 and 1106m DN700 Mild Steel Cement Lined (MSCL) Water Distribution Main along Marmion Ave between Santorini Blvd and Shorehaven Blvd. Construction of 2 off take branches including 49m of DN500 MSCL and 4m of DN400 MSCL.

Connections and tie-ins including:
• To the existing non-operational DN800 MSCL main
• To the existing operation DN500 MSCL main
• To the existing non-operational DN700 gate valve and operational DN375 PVC
• To the existing operational DN250 PVC reticulation pipe.

Stage 2 – Approximately 2479m DN700 mild Steel Cement Lined (MDSCL) Water Distribution Main along Marmion Ave between Santorini Blvd and Kingsbridge Blvd. Construction of 3 off take branches including 89m of DN700 MSCL, a DN150 scour valve, DN150 air valve, access chambers, 9m of DN400 MSCL and 9m of DN500 MSCL.

Connections and tie-ins including:
• To the existing operation DN700 MSCL main.
• To the existing operation DN250 PVC reticulation pipeline.

alkimos project

Project Details

Client. Water Corporation
Location. Alkimos WA, Australia
Project Duration. 7 months
Fields marked with an * are required

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2021 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine