This project included the installation of:
Cape excavated 2 x trenches with a 65T trencher through pre-blasted rock, installing sand bedding, the services, sand cover and protection, and backfill and compaction; and completed 4 x HDD shots through rock with a total meterage of 220m with pipe / conduit from 100mm-315mm diameter.