Construction of DN630 Yule Bore Collector Main
6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing
6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new culverts on the new track alignment;