Scope of works included the installation of a dedicated fibre optic infrastructure along the Perth to Bunbury Highway to enable communications between the Traffic Operations Centre and the Intelligent Transport Systems located on the highway.
The installation of a pit and conduit infrastructure along the west side (northbound to Perth) included: