Solomon Horizontal Dewatering Wells

Fortescue Metals Group (FMG)

Location

Solomon Hub, Pilbara, WA

Service

HDD Drilling

Sector

Mining

Expertise

Horizontal dewatering wells for large-scale open-pit mining operations.

Cape Dunstans delivered Australia’s first horizontal dewatering wells constructed for a major open-pit mine at Fortescue’s Solomon Hub in the Pilbara.

The innovative system eliminated the need for conventional in-pit vertical dewatering infrastructure. This reduced activity within the operating pit, improved safety and enabled more efficient water recovery through the strategic placement of the wells.

Project delivery included:

Two horizontal dewatering wells successfully drilled to measured depths of 938 metres and 1,200 metres.

Installation of oilfield-style electric submersible pumps capable of achieving a sustained combined output of 250 litres per second.

An innovative horizontal well design that reduced in-pit infrastructure and improved the safety and efficiency of the mine’s dewatering operations.

← Previous → Next

Let's talk

We construct trenchless infrastructure through strong partnerships practical engineering and controlled construction.

→ Get in touch