Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us
Think Safe
Menu
Cape
  • Crushing, Mining Services & Civil Utilities Services
  • About
    • Company Profile
    • Our People
    • Our RIPPA Values
    • Health and Safety
    • Environmental Policy
    • Quality Policy
    • Whistleblower Policy
    • Community Engagement
    • Supply Chain
    • Projects
  • Service
    • Crushing & Screening Services
    • Fibre Optic Communication & Signalling Cable Installation
    • Gas Pipelines Installation
    • Underground Power Cable Laying Installation
    • Tailings Storage Facility (TSF) and Ponds Construction
    • Water Pipeline Installation & Dewatering Services
    • Trencher Hire and Services
  • Careers
  • Announcements
  • Contact Us

Home / Projects / Borefield Pipeline Installation Mt Keith Nickel Operation

Borefield Pipeline Installation Mt Keith Nickel Operation

Water Project: BHP Billiton (Wiluna WA)

This was a 35km pipeline installation as part of a major upgrade to site processing facility. To comply with environmental conditions, the pipeline had to be buried the whole 35km with a trenching machine being utilised for this. The poly pipe was welded in compliance to the conditions set out in the Scope of Works.

Once welded, 50m poly pipe lengths were placed on trailer carts then towed to the trench. Here they were welded to existing lines then picked up and placed into the trench utilising an excavator.
The excavator would then place material over the pipe until it was completely covered and erected signage.

The project was completed achieving Zero Harm, on time, and on budget.

mt keith project

Project Details

Client. BHP Nickel West
Location. Mount Keith, Wiluna WA, Australia
Project Duration. 3 Months
Fields marked with an * are required

About Us

  • Company Profile
  • Our People
  • Our RIPPA Values
  • Health and Safety
  • Environmental Policy
  • Quality Policy
  • Whistleblower Policy
  • Community Engagement

Services

  • Crushing & Screening Services
  • Fibre Optic Communication & Signalling Cable Installation
  • Gas Pipelines Installation
  • Underground Power Cable Laying Installation
  • Tailings Storage Facility (TSF) and Ponds Construction
  • Water Pipeline Installation & Dewatering Services
  • Trencher Hire and Services

More Information

Copyright ©2021 Cape.
  • Privacy Policy
  • Sitemap
Website designed and built by Media Engine