Location
Snowy Mountains, NSW
Service
HDD
Sector
Infrastructure
Expertise
Environmentally sensitive crossings, HDD engineering, drilling fluid management and complex ground conditions.
Cape Dunstans delivered horizontal directional drilling (HDD) services for Future Generation JV as part of the Snowy Hydro 2.0 project in the Snowy Mountains, NSW. The works involved the installation of electrical and communications conduits across three river, wetland and road crossings within the Snowy Mountains National Park.
Following environmental challenges experienced during earlier works, Cape Dunstans was engaged to provide specialist drilling expertise and complete the required crossings. Operating within environmentally sensitive areas and restricted construction corridors, the team implemented detailed hydrofracture analysis, carefully managed drilling parameters and utilised recycled drilling fluids to minimise environmental risks and support successful project delivery.
Project delivery included:
Installation of DN180 electrical and DN63 communications conduits across three crossings, including Nungar Creek and the Tantangara Creek Bypass.
Detailed hydrofracture analysis, drilling parameter management and implementation of Trigger Action Response Plans (TARPs) to manage environmental risks.
Use of specialist HDD equipment and in-house drilling fluid cleaning systems, enabling the successful completion of crossings without environmental impact from the drilling works.