The scope of works included:
• 597m of open trenching and excavation works
• 234m Horizontal Directional Drilling
• 65m Horizontal Directional Drilling through brick structure and stumps
• 896m of marker post installation and reinstatement works along the pipeline corridor
• Hydrotesting and DCVG survey works