Yule Collector Main

12 February 2019

Water Project: Water Corporation (Port Hedland WA) Construction of DN630 Yule Bore Collector Main 6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing 6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new […]

Read More

Peelhurst Pressure Mains & Pump Station

12 February 2019

Water Project: Water Corporation (Rockingham WA) Supply, construction, installation, testing and commissioning of 5,780m of new DN375GRP and DN400 PE100 PN20 distribution main, fittings, pits and access chambers. Supply, construction, and installation of all precast and in cast situ concrete structures, along Warnbro Sound Ave. The project also involved the upgrading of 3 Pump Stations: […]

Read More

Construction of Gravity Sewer and Pressure Main at Peel Terrace

12 February 2019

Water Project: Water Corporation (Busselton WA) Supply and Install approximately 563m of DN250 PE100 pressure main on Cammilleri Street and Peel Terrace by Horizontal Directional Drilling; supply and install 100m of 375 PVC Gravity Sewer by open trench incl. but not limited to the supply and installation of plastic lined access chamber and preparation for […]

Read More

Borefield Pipeline Installation Mt Keith Nickel Operation

12 February 2019

Water Project: BHP Billiton (Wiluna WA) This was a 35km pipeline installation as part of a major upgrade to site processing facility. To comply with environmental conditions, the pipeline had to be buried the whole 35km with a trenching machine being utilised for this. The poly pipe was welded in compliance to the conditions set out […]

Read More

Alkimos Distribution Main

12 February 2019

Water Project: Water Corporation (Alkimos WA) Stage 1 – 1735m DN800 and 1106m DN700 Mild Steel Cement Lined (MSCL) Water Distribution Main along Marmion Ave between Santorini Blvd and Shorehaven Blvd. Construction of 2 off take branches including 49m of DN500 MSCL and 4m of DN400 MSCL. Connections and tie-ins including: • To the existing […]