Newmont D6 Dam and Mine Infrastructure Project

29 August 2019

Water Project: Newmont (Bannister WA) Cape has been engaged by Newmont Gold Corporation to deliver the D6 Dam and Mine Infrastructure Project at the Boddington mine The overall project scope is to deliver a seven gigalitre water storage facility and includes: Supply and construction of five pumping stations complete with more than 15 pumps Electrical […]

Read More

FMG Iron Bridge Construction Water Supply

29 August 2019

Water Project: FMG (Port Hedland WA) The FMG Iron Bridge Magnetite Project is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron […]

Read More

Water Corporation 450mm PE Wastewater Pressure Main Upgrade

29 August 2019

Water Project: Water Corporation (Balingup WA) Cape was engaged by the Water Corporation to install 450mm PE Wastewater Pressure Main pipeline. The pipeline corridor passed through a Bush Forever site that is also a wetlands catchment. To minimise the need for clearing and disturbance of potential acid sulphate soil, Cape’s EcoPlough was chosen as the most environmentally friendly option […]

Read More

Altura Mining TSF Pipeline & HDD

16 April 2019

Water Project: Altura Mining (Pilgangoora WA) Cape was engaged by Altura Mining to undertake the installation of a 10km TSF pipeline and supporting infrastructure, including pump manifolds and reverse osmosis plant pipeworks. In addition, Cape also performed horizontal directional drilling (HDD) works to install 155m of DN250 pipe under the BHP rail line. The project, located […]

Read More

Pilgangoora Lithium-Tantalum Project

27 March 2019

Water Project: Pilbara Minerals (Marble Bar WA) In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure. The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore […]

Read More

Newmont Boddington Drainage Trenching

27 March 2019

Water Project: Newmont (Bannister WA) Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including: Embankment toe drain constructed along the toe of the existing embankment Buttress toe drain constructed along the downstream toe of the constructed buttress Perimeter drain constructed outside of the […]

Read More

FMG Culverts (Pilbara)

27 March 2019

Water Project: Fortescue Metals Group (Nullagine WA) Through our Aboriginal KCU joint venture, Cape installed culverts for FMG at its Cloudbreak and Christmas Creek mine sites in the Pilbara. The scope of works included: • Survey, level and alignment of culverts at each location • Road diversions to accommodate two-way traffic • Load, transport and unload […]

Read More

FMG Dewatering Operations (Pilbara)

27 March 2019

Water Project: Fortescue Metals Group (Mount Sheila WA) Through our Aboriginal KCU joint venture, Cape continues to run one of the largest dewatering programs in the southern hemisphere for FMG, at their Cloudbreak, Christmas Creek and Solomon mine sites in the Pilbara. We have installed approximately 100km of dewatering pipelines annually over the past five years. This includes deposition […]

Read More

Busselton Pressure Main & Gravity Sewer

12 February 2019

Water Project: Water Corporation (Yalyalup WA) Package 2A: This package comprised of approximately 8172m of PN16 DN300 O-PVC pressure main and 405m of DN400 SDR11 HDPE pressure main. It included the construction of approximately 555m of PN12 DN250 U-PVC pressure main from the existing Blum Boulevard pressure main connection point on Hawker Approach to a […]

Read More

Busselton West Pressure Main

12 February 2019

Water Project: Water Corporation (West Busselton WA) Construction of Busselton West Street DN450 Pressure Main Replacement including: 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street Installation of 500m temporary DN200 HDPE […]

Read More

Carnarvon Bore Main Replacement

12 February 2019

Water Project: Water Corporation (Carnarvon WA) Stage 1 Construction, installation, testing and commissioning of 10.5km of DN630 PN12.5 HDPE to replace the existing DN600 Asbestos Cement (AC) bore water collector main. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, stock watering points, bore connection fittings and ancillaries. […]

Read More

Narembeen TWS Upgrade

12 February 2019

Water Project: Water Corporation (Narembeen WA) Manufacture, supply, construction, installation, testing and pre-commissioning of civil, structural, mechanical, process, electrical, instrumentation & control (I & C) infrastructure assets for the MS Extension Narembeen TWS Upgrade. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, and associated ancillaries. Supply and […]

Read More