Altura Mining TSF Pipeline & HDD

16 April 2019

Cape was engaged by Altura Mining to undertake the installation of a 10km TSF pipeline and supporting infrastructure, including pump manifolds and reverse osmosis plant pipeworks. In addition, Cape also performed horizontal directional drilling (HDD) works to install 155m of DN250 pipe under the BHP rail line. The project, located at Pilgangoora in Western Australia, is […]

Read More

Pilgangoora Lithium-Tantalum Project

27 March 2019

In 2018, Cape undertook water infrastructure works for Pilbara Minerals at its Pilgangoora Lithium-Tantalum Project. Our team continues to provide assistance with the removal, installation and adhoc management of its dewatering bore infrastructure. The original scope of work included the provision of pipelines, earthworks, telemetry control system, submersible bore pump packages and a transfer pumping station […]

Read More

Newmont Boddington Drainage Trenching

27 March 2019

Cape is constructing three drainage lines running parallel to the length of the existing buttress for Boddingtons F1/F3 Residue Disposal Area (RDA), including: Embankment toe drain constructed along the toe of the existing embankment Buttress toe drain constructed along the downstream toe of the constructed buttress Perimeter drain constructed outside of the buttress footprint/work area. Cross drains […]

Read More

FMG Culverts (Pilbara)

27 March 2019

Through our Aboriginal KCU joint venture, Cape installed culverts for FMG at its Cloudbreak and Christmas Creek mine sites in the Pilbara. The scope of works included: • Survey, level and alignment of culverts at each location • Road diversions to accommodate two-way traffic • Load, transport and unload all culvert pipes and other construction materials […]

Read More

FMG Dewatering Operations (Pilbara)

27 March 2019

Through our Aboriginal KCU joint venture, Cape continues to run one of the largest dewatering programs in the southern hemisphere for FMG, at their Cloudbreak, Christmas Creek and Solomon mine sites in the Pilbara. We have installed approximately 100km of dewatering pipelines annually over the past five years. This includes deposition lines, decant lines, and borefieldlines in both HDPE […]

Read More

Busselton Pressure Main & Gravity Sewer

12 February 2019

Package 2A: This package comprised of approximately 8172m of PN16 DN300 O-PVC pressure main and 405m of DN400 SDR11 HDPE pressure main. It included the construction of approximately 555m of PN12 DN250 U-PVC pressure main from the existing Blum Boulevard pressure main connection point on Hawker Approach to a DN1200 discharge access chamber and stub […]

Read More

Busselton West Pressure Main

12 February 2019

Construction of Busselton West Street DN450 Pressure Main Replacement including: 655m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling along verge of a swamp 151m of DN450 HDPE PN16 Pressure Main installed by horizontal directional drilling under Frederick Street Installation of 500m temporary DN200 HDPE PN16 bypass pressure main 2 nightshift shutdowns […]

Read More

Carnarvon Bore Main Replacement

12 February 2019

Stage 1 Construction, installation, testing and commissioning of 10.5km of DN630 PN12.5 HDPE to replace the existing DN600 Asbestos Cement (AC) bore water collector main. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, stock watering points, bore connection fittings and ancillaries. Also, construction of a pipeline access […]

Read More

Narembeen TWS Upgrade

12 February 2019

Manufacture, supply, construction, installation, testing and pre-commissioning of civil, structural, mechanical, process, electrical, instrumentation & control (I & C) infrastructure assets for the MS Extension Narembeen TWS Upgrade. Including supply, delivery to site and installation of all Tie-ins’, section valves, air & scour valves, and associated ancillaries. Supply and Install West Narembeen Tank to Narembeen […]

Read More

Yule Collector Main

12 February 2019

Construction of DN630 Yule Bore Collector Main 6.2km of DN630 PN12.5 HDPE pipe including clearing, stringing from stockpile, welding, trenching, backfill, valves and pressure testing 6.2km of access track construction including demolition of six existing culverts along the 6km collector main access track and construction of six new culverts on the new track alignment;

Read More

Peelhurst Pressure Mains & Pump Station

12 February 2019

Supply, construction, installation, testing and commissioning of 5,780m of new DN375GRP and DN400 PE100 PN20 distribution main, fittings, pits and access chambers. Supply, construction, and installation of all precast and in cast situ concrete structures, along Warnbro Sound Ave. The project also involved the upgrading of 3 Pump Stations: Bluestone Parkway Pump Station, Naples Place […]

Read More

Construction of Gravity Sewer and Pressure Main at Peel Terrace

12 February 2019

Supply and Install approximately 563m of DN250 PE100 pressure main on Cammilleri Street and Peel Terrace by Horizontal Directional Drilling; supply and install 100m of 375 PVC Gravity Sewer by open trench incl. but not limited to the supply and installation of plastic lined access chamber and preparation for connections to existing discharge Main and […]

Read More