South Flank Piping & Electrical Package

16 April 2019

Communications & Power Project: NRW (Newman WA) BHP’s South Flank deposit is located approximately 130 km by road north-west of the town of Newman, and approximately 8 km to the south of the Companys existing Mining Area C operation. Cape have been engaged by NRW to deliver piping and electrical packages as part of NRW’s […]

Read More

Great Northern Highway Relocation

16 April 2019

Power Project: Western Power (Muchea WA) Cape has been engaged to relocate distribution assets along Great Northern Highway to facilitate the completion of the Main Roads WA Great Northern Highway – Muchea to Wubin (Stage 2) Project. The scope includes approximately: 2.5km of underground cable, 1.6km of conduit, 18km of conductor and 116 new wooden poles […]

Read More

PTA Airport Link Traction Power Supply Project

27 March 2019

Power Project: Western Power (Maida Vale WA) In 2018, Cape secured a contract to energise the Public Transport Authority’s new Maida Vale Substation, as part of the Forrestfield Airport Link Project. Our team is installing approximately 3.5km of three phase underground cable, communications ducts and associated pits to create a new transmission line from the existing 132kV […]

Read More

Wanneroo Road and Joondalup Drive Relocation

27 March 2019

Power Project: Western Power (Sinagra WA) Cape has been engaged to install two 132kV circuits of underground transmission line as well as supply and construct foundations for transition poles as part of the Main Roads WA overpass bridge construction at the intersection of Joondalup Drive and Wanneroo Road.

Read More

Floreat Underground Power Program

27 March 2019

Power Project: Western Power (Floreat WA) In 2018, Cape was awarded two packages of work, as part of the Town of Cambridge’s $40 million underground power program – Floreat East and Floreat West, encompassing 1781 homes, 57km of horizontal directional drilling, removal of 965 power poles and the installation of 597 street lights. Cape has been supporting Western […]

Read More

The Bluff Wind Farm

12 February 2019

Power Project: ETSA (Jamestown SA) The installation at the Bluff Wind Farm situated in Jamestown, South Australia comprised 15,500mtrs of HV cable, 28,000mtrs fibre optic cable and 25,500mtrs earth wire connecting 25 turbines putting our EcoPlough with its unique ploughing method to work. This project was environmentally friendly with minimal disturbance to the vegetation and […]

Read More

Jimblebar – RGP6

12 February 2019

Power Project: BHP Billiton & Theiss (Newman WA) The project was located approximately 39km east of Newman and involved detailed earthworks, trenching, bedding, and backfilling of underground services as well as the installation of electrical and communications infrastructure. The scope included: 206,000 bcm of detailed earthworks 41km of Raw Water and Portable Water Pipelines 4km Oily […]

Read More

Port Hedland Inner Harbour Project

12 February 2019

Power Project: BHP Billiton & Calibre (Port Hedland WA) Located in the Pilbara region, Cape was engaged to supply, install and commission high voltage and low voltage power infrastructure to BHP Billiton assets in and around Port Hedland and Finucane Island. The scope included: 100km of LV cable 40km of HV cable 7 x switchgears […]

Read More

Claremont WTE-CTE 81 Relocation

12 February 2019

Power Project: Western Power (Claremont WA) The scope of works for this project included: A section of the existing WT-CTE 81 overhead 132kV transmission line was moved underground and replaced between existing pole 49 (Eastern side of the alignment) and pole 57 (Western side of the alignment) Installation of one new cable transition structure, transitioning […]

Read More

CBD Works – 2 Stages

12 February 2019

Power Project: Western Power (Perth WA) Stage 1 included the installation of eight no. 150 diameter A15:B15 carrying 11kv feeder cable through the Perth city centre to supply the new BHP building. The cables were laid within eight conduits beneath the road pavement in a trench approximately 1.3m width and 1.2m deep. This project required close liaison […]

Read More

Calleya 400HV Cable Installation

12 February 2019

Power Project: Stocklands (Harrisdale WA) This project involved the construction and installation of: • Approximately 6.2km of 1 x 400mm2 HV feeder cable & conduit from Southern River Zone Substation to Pole termination of Warton road • 400mm2 HV cable joint bay • Cable joints to the feeder cable • HV straight joints • Sheath testing of […]

Read More

132kV Feeder Joel Terrace

12 February 2019

Power Project: Western Power (Perth WA) Cape undertook the task of installing three new feeder cables in existing conduits and extend the existing spare conduits by approximately 20 metres under the railway reserve between East Parade and Summer Street, East Perth.

Read More